PATC Home Stonewall Brigade Home Schedule Planning Current Weather Scrapbook Trails History Questions?

 

 

Trail Work Session

Installing Signs on Great North Mountain

May 20, 2006

(click any image to see it full-sized)

Click for full size

Breaking ground on a posthole with digging bar and shovel.
From the left, volunteers Lee and Sriram.

Click for full size

The hand is mightier than the shovel at this depth.
From the left, Jim, Lee, Sriram (with hand in the hole), Leslie, Simon.

Click for full size

Crew Chief Jim Tomlin prepares the signpost while Lee stretches for the bottom of the hole.
From the left, Leslie, Jim, Simon, David, Lee (arm and face in the hole) and Sriram.

   
Click for full size

The signpost is planted.
From the left, David, Sriram, and David.

Click for full size

The first two signs are firmly bolted to their post.
From the left, Catherine, Simon, David, Jim, David, Lee, Leslie.

   
Click for full size

Yet another hole, for the signpost being prepped in the background.
From the left, Jim, David, Leslie, Sriram.

Click for full size

Proud Stonewall Brigadiers pose with first of their three signposts of the day.
Clockwise from the left, Crew Chief Jim Tomlin, with volunteers David, Simon, Catherine, Lee, David, and Sriram. Team member Leslie was behind the camera.

Return to Top

Contact the Stonewall Brigade at
stonewall@patc.net.